Our Factory
15,000 m² in Guangzhou, Guangdong Province. Structure fabrication, foliage production, assembly and quality control happen under one roof — which is why a specification change is a conversation, not a supply-chain problem.
Capability at a glance
What happens inside





Steel and fibreglass fabrication
Tree armatures and palm cores are welded or moulded in-house, which is what makes a 10 m tree structurally credible rather than a scaled-up ornament.
Foliage production and printing
Leaf material, colour matching and printing are done to a retained standard, so repeat orders hold the same colour instead of drifting batch to batch.
Assembly and finishing
Trees are fully assembled and photographed before being broken down for shipping, which is how we catch a canopy that reads wrong before it crosses an ocean.
Quality control
Every unit is inspected — structure, finish, foliage density, colour and fixing hardware. Oversized items get a pre-shipment assembly photograph record.
Inside the structure shop
Steel first, skin second. These are the welds and fittings that decide whether a 10 m palm still stands straight in year five — and the reason we can quote a wind rating rather than hope for one.









The palm trunk line: from steel tube to sealed container
Photographs from an actual palm trunk production run — the same line a wind-rated palm order goes through, from incoming steel to a sealed container.









Quality control process
- Incoming material check
Foliage, resin, steel and hardware are checked against the retained standard before production begins.
- In-process inspection
Structure welding, frame geometry and foliage attachment are inspected during build, not only at the end.
- Full assembly test
Trees and palm crowns are assembled in full, photographed and checked against the approved drawing.
- Pre-packing inspection
Final finish, hardware count, carton marks and packing protection before the container is loaded.
- Third-party inspection
SGS, BV or TÜV inspections are welcomed at our factory before sealing. Tell us at order stage and we schedule production around it.
Audits and documentation
We support buyer audits, factory visits and social compliance questionnaires. If your procurement process requires a specific document set — business licence, export records, material declarations, fire test reports, or a completed audit questionnaire — request it at enquiry stage and we will confirm what can be provided.
Visit or request documentation
Ready to quote your project?
Send dimensions, drawings or reference images and we will reply with a priced quotation and a production drawing — normally within 24 hours on business days.